Laterite Nickel · Sulawesi Operations · Est. 2019

The nickel yourbatteries need.The land demands back.

t / yr
100t85,000t

Supply Coverage

of requested volume

Carbon Intensity

t CO₂/t
vs industry14.6 avg

Est. Lead Time

days

Port-to-port

Carbon Intensity vs. Industry Benchmark

Live estimate
Seam8.2 t CO₂ / t Ni
Industry Average14.6 t CO₂ / t Ni
2.1Mtonnes Ni
Proven Reserve
85Kt Ni / yr
Annual Output
99.8% Class 1
Purity Grade
24years remaining
Mine Life
Operational Pulse · FY2025

Every tonne extracted.
Every hectare returned.

Flip each card to see the environmental counterpart of every operational metric. This is the rhythm of responsible extraction.

Extraction
Flip →
4.2M
tonnes / yr
Ore Extracted
Utilisation78%
Restoration
← Flip
847
ha active recovery
Hectares Rehabilitated

For every tonne mined, engineered wetlands grow back.

Recovery progress62%
Extraction
Flip →
38.4M
litres / yr
Diesel Consumed
Utilisation65%
Restoration
← Flip
34
% electric / hybrid
Fleet Electrification

Transitioning haul fleet to battery-electric by 2028.

Recovery progress34%
Extraction
Flip →
12.6M
m³ / yr
Water Drawn
Utilisation82%
Restoration
← Flip
9.8M
m³ treated & reinjected
Water Returned

78% of water drawn is treated and returned to watershed.

Recovery progress78%
Extraction
Flip →
697K
t CO₂e / yr
Scope 1+2 Emissions
Utilisation55%
Restoration
← Flip
124K
t CO₂e via reforestation
Carbon Sequestered

Reforestation corridors sequester and track carbon credits.

Recovery progress18%
2031
Net Emission Reduction Target
Net-zero Scope 1+2
2028
Rehabilitation Completion
Final pit backfill
62%
Renewable Energy Mix
Solar + hydro on-site
Company Journey · 2019 → 2031

From first drill core
to net-zero horizon.

Geological time compressed into a decade of deliberate action. Each milestone is audited, published, and binding.

Operational

First Drill Core

Laterite ore body confirmed at 2.1M tonne Ni equivalent. Environmental baseline survey complete.

2.1M t Ni
2019
2021
Commercial

HPAL Plant Commissioned

High Pressure Acid Leach facility online. First Class 1 nickel produced for battery-grade qualification.

Class 1 certified
Environmental

Rehabilitation Zone 1

First 120 hectares of engineered wetlands seeded over backfilled pit. Avian survey shows 34 returning species.

120 ha restored
2022
2023
Commercial

Gigafactory Offtake Signed

Five-year supply agreement signed with two Korean battery manufacturers. Combined 42,000 t/yr commitment.

42K t/yr locked
Environmental

Solar Array Online

48MW solar installation cuts diesel dependency by 22%. Fleet electrification program begins with 12 BEV haul trucks.

48 MW solar
2024
2025
Operational

MHP Line Expanded

Mixed Hydroxide Precipitate output doubled to meet rising demand from US IRA-compliant battery supply chains.

2× MHP capacity
Environmental

Final Pit Backfill

Target: all open pits progressively backfilled and seeded. Wetland corridors connect to adjacent national park buffer.

Target: 847 ha
2028
2031
Environmental

Net-Zero Scope 1+2

Target: Scope 1 and 2 emissions fully offset through on-site renewables, reforestation credits, and carbon capture.

Net-zero target
Supply Credentials

Purity grades built
for gigafactory specifications.

Most requested

Class 1

≥ 99.8% Ni

Briquettes / Rounds

Application
NMC / NCA Cathode
Carbon Intensity
8.2 t CO₂/t Ni
Certification
LME-approved

MHP

35–40% Ni

Mixed Hydroxide Precipitate

Application
Precursor PCAM
Carbon Intensity
6.4 t CO₂/t Ni
Certification
IRMA Level 3

Ni Sulfate

22% Ni

Aqueous solution

Application
Direct battery precursor
Carbon Intensity
7.1 t CO₂/t Ni
Certification
ISO 14064

Audited Certifications

IRMA Level 3
Initiative for Responsible Mining Assurance
ISO 14064
GHG quantification & reporting verified
LME Approved
London Metal Exchange listed brand
OECD Due Diligence
Conflict minerals compliance framework

Offtake Partners

PO
POSCO Future M
Cathode Manufacturer
South Korea
UM
Umicore
Battery Materials
Belgium
NO
Northvolt
Gigafactory
Sweden
SK
SK On
Battery Cell
South Korea
FR
Freyr Battery
Gigafactory
Norway
EN
Envision AESC
Battery Systems
Japan / UK

Ready to qualify Seam as a supply source?

Our supply partnership portal walks you through qualification in 3 steps.